This is the least favorable option as it is not reversible.
Running wires through a roof.
Thanks all it s a little confoosing.
This option is quite self explanatory where a hole is simply drilled through the outer roof skin and wires passed through a rubber grommet into the roof cavity and fed down into the vehicle.
In this video we install a roof mounted wiring box with waterproof cable glands.
As soon as you have a hole you are providing a path for water.
The installer ran the wires without properly sealing them and without leaving an option to add future wires.
Additionally if you ever need to redo the roof it will be a pain to deal with the wires that are now in the way.
The best way is to go around the roof not through it.
October 02 2013 06 02 35 am you should already have a hole in the roof for 1 1 2 or 2 inch vent pipe for the holding tank and sink drains.
Running wires through the roof reply 5 on.
I guess i m not passing it through joists it s going over them so i could argue the case it came to it not that i want to argue with the assessor but y know.
What does the nec say about running the pv wires through the roof.
The next step is to run the solar or antenna cables into the rv through the new access hole.
Please refer to these above options as a guide only.
Better to come out of wall then go up to the roof.
Drilling through the roof.
I could read the reg s section 2 3 2 from the electricans guide to the reg s to say that if a cable passes through joists it needs to be 50mm from top or bottom or in earther conduit.
You can seal it but it s always going to be a weak spot.
Run the cables through the roof access.
I am a radio amateur and want to run an antenna cable through my house s tiled roof up by the chimney length of cable run is important and running it down over the tiles over the gutter then up and in through the soffit is too long and there s no way to fix the cable on the 5m run down the tiles.
The code requirement that the pv source and output conductors be kept outside the building until the readily accessible disconnect is reached indicate that these conductors are to be treated in a manner similar to ac service entrance conductors 690.
First drill holes in the side of the box for cables big enough to fit the threaded end of the cable gland make sure to leave room for future cables.