The cedar siding is first acclimatized by storing on stickers.
Rough sawn cedar siding installation.
The single course 90 long profile minimizes waste during installation especially around dormers and peaks.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
Available in tando solid color series and tando natural color series.
Moisture can however seep into joints where two vertical.
Lap siding can be installed horizontally or vertically.
For the beleveld lap siding we used flood cwf on the rough side facing out.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
Tando roughsawn cedar single features random mill saw marks and a long subtle grain for a clean classic look with 6 inch exposure.
Painted siding 1x10 channel rustic lap cedar.
If you choose to install channel siding vertically be sure to bevel cut the ends and install so water is directed to the outside.
For horizontal applications start with the bottom course and work up with the channels pointing upwards.
Log in or create an account to post a comment.
This is particularly important for vertical installation.
Do not nail through overlaps.
The boards were pre coated on all other sides before installation.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Ordinary rough sawn boards are best installed as vertical siding which ensures that moisture will not collect on horizontal surfaces.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board facing the street side of the house and overlapping the edge of the adjoining.
Damp siding should be allowed to acclimatize from three to five days dry knotty cedar siding for 7 to 10 days and green siding for a minimum of 30 days.