Drawing title drawing download.
Roofing pitch pocket detail.
Detailed drawings single ply.
Everguard tpo single ply roofing system molded pourable sealer pockets provide roofing contractors an easy to install factory built detail.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
By filling all the gaps between the base of the pocket and the roof the asphalt prevents water from leaking into the roof.
Roof area divider curb type.
Seal the edges of the curb.
424 continuous endlap detail tpa 101 roof membrane layout wall tpa 102 roof membrane layout coated metal tpa 103 roof perimeter fastening plan detail 8 4 6.
Paraguard expansion joint roof to wall with parasolo flashing.
Multi ply roof system cross section adhered insulation in ftr 601 adhesive w sbs base ftr das2mp.
This detail can eliminate the need for specifications covering these conditions.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
This detail is referenced on the roof plan.
Heat welded walkway installation.
Wall flashing with coated metal edge.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
Originally coal or tar pitch was used to seal these fixtures to the roof deck which is where the pitch pocket gets its name today installers may pour hot asphalt or grout into the top of the pocket to form a tight seal.
Multi ply roof system cross section adhered insulation in asphalt ftr das1mp pdf dwg.
Wall base termination detail.
Seal and prime penetration.
Allow a minimum of 1 clearance from the inside of the curb to the penetration.
Hold your cursor over the file name to view when a drawing was last updated.
Once the edges of the curb are sealed the newly created pitch.
Apply a bead of m bond at the base of the penetration and then prime the penetration with m bond 3 so it shows 1 above the m curb after it is installed.
Choose the proper curb size.
Lightning protection terminal roof mount detail.
Wall with self terminating parapro paraflex 531 liquid flashing.
Everguard molded accessories are manufactured using a proprietary formulation designed for use with gaf s everguard tpo single ply membranes.