Building a shed roof over a deck.
Roof deck floor framing.
Many building departments require a local architect or engineer to design plans for porch roofs because of the increased snow roof and wind loads created by adding a roof.
When evaluating the impact of occupied roof decks on the overall building size limitations another consideration is whether the project qualifies as a high rise building.
They are merely placed on top of another structure.
If you want your deck to last and more importantly be a safe place to spend time with your family and friends you need to start with a solid foundation and a sturdy frame.
The single most important framing member is the ledger board.
Once the framing was done the crew installed 3 4 in.
Building a roof over a deck allows you to grill relax play or simply stay quiet and listen to nature whether rain or shine.
A roof on a treasured deck can open up more possibilities for enjoying the space throughout the year.
After the subflooring is set the crew will be raising gable walls flying the scissor trusses to define the space and installing roof sheathing.
When this system of connections is made properly loads are transferred.
The roof deck should be properly flashed with a highly durable material that is compatible with the deck material copper lead epdm etc where it adjoins the house.
Building a deck over a flat roof is very similar to building a deck over a concrete patio.
Advantech subflooring as the third floor deck adhered with advantech foam glue.
Fortunately there are clear guidelines and time tested techniques for installing the foundation posts beams ledgers and joists when framing a deck.
Deck framing page 16 beam to post page 12 post to concrete page 11 joist to beam page 14 a system of key connections throughout the deck framing also known as a continuous load path is essential to building a safe code compliant deck.
The finished walking surface of the roof deck surface should be below the level of the interior floor by at least 1 1 2 inches.
Floor framing formerly known as parametric bay studies can help engineers determine optimal composite steel and concrete slab on metal deck floor framing.
It s a good idea to mark joist locations on the ledger and on the front facing rim joist before installation when you can lay the framing members side by side on a pair of sawhorses.
These decks are often referred to as floating as they are not secured in place as a stand alone structure.
There are a few things to know before erecting a protective roof.
Ibc section 202 defines a high rise building as a building with an occupied floor located more than 75 feet 22 860 mm above the lowest level of fire department vehicle.